![]() |
|
| CONSTRUCTION DATE and information |
PICTURE |
||
|
September (early) ~07
The ever-filling engine room has its removable floors fitted. The one directly in front is the entrance step and the one on the right is more of a crawl gangway over the 2 engines transmissions and generator. |
|
||
|
|
return to diary build page 3 |
|
|
| HOME <> SITE MAP <> CONTACT US <> ABOUT US <> JENAL DIARY <> SUPPLIER CONTACTS <> DUTCH BARGE ASSOCIATION |